|
|
|
|
|
|
|
|
|
Pg 5 |
|
|
Chapter II.
THE FIRST TWO YEARS: 15 AUGUST 1942 - 12 JULY 1944
"March, Shoot, and Obey"
THE 91ST INFANTRY DIVISION was officially reactivated at Camp White, Oregon on
15 August 1942. Actually Major General Charles H. Gerhardt had arrived at Camp
White on 8 July 1942, and by 19 July most of the Division officers had reported
for duty. Although in certain specialized arms the original cadre was selected
from technical schools or commands, the majority came from the 1st Cavalry
Division, stationed at Ft. Bliss, Texas. At the elaborate ceremony of
reactivation on 15 August, 529 officers and 1279 enlisted men listened to the
roll call of the dead and witnessed the moving ceremony of the presentation of
colors. So the new 91st was born. Quickly all efforts were bent to building up
the Division to numerical strength, and then to training the men for the battle-
trials ahead.
Early in September occurred the famous 91 mile march, of which the original
members of the Division still reminisce. Undertaken to instruct the cadre in
marches and bivouacs and to test the best physical powers of the officers and
men, the march of 91 miles was made through the rough roads and trails of the
Cascade Mountains. The distance was covered in 28 3/4 hours of actual marching
time.
|
|
|
|
6 |
|
|
With the gruelling test passed, the cadre settled down to the training of the
men sent to the Division. During October and November over 12,000
men poured into Camp White from all parts of the country and the training of
these men began in earnest. Nearly all of them had no previous military
training and so, on 15 November, they began with the basic fundamentals. The
training period covered 39 weeks; basic training lasted until 15 February; unit
training in platoon and company formations occupied the next 13 weeks, 15
February to 13 May. The last 13 weeks, devoted to the tactics of the Battalion
and Regiment, were climaxed by maneuvers involving the whole Division held in
the vicinity of Camp White, 21 June - 10 July 1943.
Maneuvers
At the conclusion of the “D” series maneuvers the Division took stock of its
progress, and weaknesses, as revealed by the maneuvers, were corrected. In
addition there was considerable training in the assault of fortified area. This
phase, of the training was directed by Major General William G. Livesay, who
became Commanding General of the Division, 14 July 1943. Under his supervision
the Division prepared for IV Corps maneuvers at the Bend Maneuvers Area,
approximately 10,000 square miles of terrain ranging from hot dusty desert to
cold mountainous country. The Division closed there on 1 September 1943.
In all, there were eight problems in which the 91st, together with the 96th and
the 104th Divisions, took part in both offensive and defensive operations over
desert and mountain terrain. The extremes of heat and cold, the excessive dust,
snows and rain, and the difficult terrain tested the endurance
and ingenuity of every officer and man. The exercises accomplished their purpose
and the three Divisions which had participated emerged hard, well-trained fighting units
ready to take their places in theaters of combat.
|
|
|
|
7 |
|
|
Col. Joseph P. Donnovin, Chief of Staff, 91st Infantry Division
|
|
|
|
8 |
|
|
From Bend the Division moved to Camp Adair, near Albany, Oregon, 2 November
1943. The lessons learned in the maneuvers were thoroughly studied and every
effort was made to polish the rough edges wherever they had appeared, in
anticipation of an early alert for movement overseas. It was not a long wait,
for the alert came on 20 January 1944.
"P.O.M."
Events moved rapidly during the next few weeks -- in a swirl of intensive
planning designed to lay the groundwork for the entire movement. Simultaneous
with the first orders from III Corps, Army Service Forces assigned a "High
priority to the Division for immediately supplying those items of equipment
still short."
The message from Major General John Millikin, III Corps, directed the Division
to "conduct immediate inspections, intensify training, complete firing, and
expedite shortage lists at once" and to "submit a personnel status report on or
before 28 January 1944. It further charged the Division with submitting a
"training status report on 5 February 1944, showing the exact status of
training." Schools on boxing and crating, servicing of vehicles and weapons for
overseas shipment, Personal Affairs, and Malaria Control were immediately
conducted for all personnel of the Division.
|
|
|
|
9 |
|
|
On 28 January 1944 the War Department published the formal movement orders
setting the readiness date as 1 March for personnel and accompanying equipment,
and 15 February for the Advance Detachment. During the following weeks the
great pattern of preparation for combat was woven into a fabric that was strong
and enduring -– that would withstand the test of battle without revealing
miscalculations that foresight and planning could prevent. The Division cleared
its personnel ineligible for overseas service and received the necessary
replacements; it requisitioned equipment and issued it to the units concerned,
furloughs were granted to those eligible, security was maintained, the physical
fibre of the men was tested -– corrected when possible -- by the Division
Surgeon. Training was pushed to completion, and immunizations were given.
Gradually the 1deal of complete preparedness grew into fact, and on 8 March
General Livesay was able to report to III Corps that all arrangements short of
the last minute details had been completed and that the Division was ready to
move.
The preparation of the Division had been completed in exactly 48 days. Four days
after the General had reported the Division ready the War Department set the
final readiness dates: 20 March for personnel and accompanying equipment, 12
March for the Advance Detachment, and 14 March for the impedimenta. It would be
a mistake to imply that during this brief time of preparation the Division had
made no mistakes in its gigantic task. As a whole, however, the work had been
completed without confusion or strain.
|
|
|
|
10 |
|
|
Col. John W. Cotton, C.O. 362nd Regiment
|
|
Col. W. Fulton Magill, Jr., C.O. 363rd Regiment
|
Col. Rudolph W. Broedlow, C.O. 361st Regiment
decorates a soldier of his command
|
|
|
|
11 |
|
|
When on 11 March the first call from the port was received General Livesay
immediately called a conference of his staff and unit commanders and carefully
outlined the final plans: answered questions raised and quietly ended:
"We have a problem requiring expeditious action before us, but this isn't
anything like the problems we are going to face during the next year; so let us
start off in the right manner, with the Advance Detachment getting off tomorrow
and the impedimenta on the 14tb and the rest of the Division on time."
The echelons moved out of Camp Adair according to schedule. General Livesay and
Col. Joseph P. Donnovin, Chief of Staff, followed by air. Brigadier General
Ralph Hospital, Division Artillery Commander, was left in command of the rear
echelon. These last elements of the Division left the camp on 29 March and
closed on 3 April.
Staging
|
|
|
|
12 |
|
|
At the staging area the 91st Division came under the command of the commander of
the station. Each unit was assigned to a specific area and operated under the
command of the area commanders. The men and equipment of the Division were
checked once again, and all preparations were completed for the movement
overseas. There were to be four echelons, consisting of the Advance Party, the
first half of the Division, the remainder of the Division, less one Battalion,
and the 2nd Battalion of the 363rd Infantry, delayed because of lack of shipping
space. The first to leave was the Advance Party. At 1100, 30 March this group
of four officers and six enlisted men under the command of Brigadier General
Raymond E.S. Williamson boarded the ship for overseas. Destined for Naples,
Italy, the detachment first landed at Casablanca on 9 April and then flew by
plane to Algiers and Naples. They arrived on 11 April.
Street scene in Oran
|
|
|
|
13 |
|
|
General Livesay, accompanied by Colonel Donnovin, Chief of Staff, and Captain
Lash, Aide-de
Camp, proceeded by air after the departure of the first increment. They departed
from Washington 5 April, and after conferences in Algiers, flew to Naples for
instructions, arriving 10 April. They flew back to Algiers 16 April, and then to
Oran to await arrival of the Division.
The second echelon left the Port of Embarkation 3 April. At sea its destination
was suddenly changed from Naples to Oran, the Allied Base in Algeria. This did
not vitally affect the movement, but it did become immediately necessary for the
Advance Detachment, already at Naples, to return to Africa and reestablish the
91st Division's forward headquarters. Thus, shortly after midnight on 14 April,
this group left Italy by plane and organized the forward Command Post of the
Division at No. 10 Rue Gallieni, Oran.
The first increment of the Division arrived in convoy off the shores of Mers-el-
Kebir 18 April, debarked and moved to permanent bivouac areas, with headquarters
in Port aux Poules. Back in the United States the third echelon -- aware of the
Division's new destination sailed 12 April and arrived at Mers-el-Kebir on the
3oth. The 2nd Battalion of the 363rd Infantry left Hampton Roads on 21 April
and arrived in North Africa 19 days later, on 10 May. This officially closed
the Division in North Africa, and General Livesay wired the Commanding General
of the North African Theater of Operations: "last elements of the 91st Division
closed in Theater 10 May 1944, End.” Thus the Division which had been alerted
on the 20th of January and whose first contingent did not leave the West Coast
until the 14th of March, accomplished the approximately
7,500 mile operation in exactly 54 days.
|
|
|
|
14 |
|
|
Training in Africa
Meanwhile, assigned to the Seventh Army under the command of Major General
Alexander M. Patch, the 91st Division was immediately launched on an intensive
amphibious training program that was organized to simulate every possible phase
of battle. This training program, scheduled to last approximately six weeks,
was under the supervision of a special Invasion Training Center with
Headquarters at Port aux Poules. The 361st Infantry, with the 916th Field
Artillery Battalion and one company of the 316th Engineer Combat Battalion and
the 316th Medical Battalion attached, initiated its training 3 May.
The whole program was divided into two basic Phases: individual and small unit
training and then Battalion and, in one case, Regimental landings. There was
training in the organization of boat teams, wire breaching, debarkation drill,
demolition teams, rocket teams, flame throwers, and a dozen other aspects of
invasion technique. Then during the final period, units made landings on beaches
in Arzew Bay in Battalion strength both at night and during the day. During
these landings, it was the mission of the troops to push through a heavily
fortified zone, with barbed wire entanglements, pillboxes, and tanks; to climb
mountainous terrain, to land artillery from the sea, and to fight under the guns
of naval support. It was the toughest single period of training that the
Division had undergone.
|
|
|
|
15 |
|
|
The 361st Combat Team, commanded by Col. Rudolph W. Broedlow, completed its
course on 15
May and left the Division on detached service with the Fifth Army in Italy. The
362nd Combat Team began its schedule on 11 May. The training was the same as
that of the 361st with the exception that it executed a regimental landing,
whereas the 361st had operated only in battalion strength. Its training ended
on 19 May, shortly before the 363rd Combat Team began, and by the end of May all
the combat teams had completed the entire course.
“Dry Run” for Combat
The formal amphibious training of the 91st Division was completed on 31 May. The
next day it began preparing for a mock invasion of the Arzew beaches as the
finale to its training and as the prelude to its movement to the Italian front.
On 3 June it moved from Port aux Poules to Mediterranean Base Section Staging
Area No. 2 near Fleurus, where the final plans for the Arzew training landing,
were developed. At the same time the more comprehensive preparation required by
the permanent movement to Italy which was to follow was carried on.
|
|
|
|
16 |
|
|
D-Day for the all-out assault against enemy positions on the coast of Arzew Bay
was scheduled for 11 June. It was assumed that the area from Oran to Mostaganem
was held by elements of the German Infantry Division "W" with the "Y" Grenadier
Regiment at Oran, the "X" Grenadiers at St. Cloud, and one Battalion of the "Z"
Grenadier Regiment at Mostaganem. The entire stretch of the beach was strongly
fortified with pillboxes, barbed wire entanglements, anti-tank traps, and strong
points. There was also a force of enemy tanks reported in the vicinity prepared
to repel any possible
attack. The Division's mission was to seize the Port 0f Arzew and the airport
at the town of Renan. Its final objective was the high ground west of Renan and
south of Kleber. The plan called for a coordinated attack by both the 362nd and
363rd Regimental Combat Teams With engineer, medical, AAA, air and naval units
in direct support.
Amphibious Operations, June 1944, 91st Inf. Division
|
|
|
|
17 |
|
|
Endless landing ships of all types were massed for the “Invasion.” The Division
CP was established on the USS Biscayne while an alternate CP
was established on the HMS Derbyshire. Troops began embarking on 9 June. The
following day was spent in briefing the commanders and men on the specific plans
of the mission. Then, late that same night, 10 June, the ships moved slowly out
of the harbor of Oran under cover of darkness and steamed silently ten miles out
to sea opposite Cape Carbon and the shores southeast of Arzew.
During the night the troops were loaded into small landing craft, while a heavy
sea rolled against the sides of the ships. Forty-five minutes before H-Hour,
0400, navy destroyers laid down a heavy artillery barrage on the beaches. Under
this protective covering the first assault teams moved toward the hostile shore.
The 363rd, getting off to a late start because its landing was forced off course
by the wind, attacked at 0440 on the narrow "Ranger" beach just south of Cape
Carbon. They landed in 14 waves and when they hit the beach, they struck hard.
Within 12 minutes the first wave had breached the initial wire entanglements at
the beach's edge and was moving south to its next phase line. By the end of the
first hour the Regiment had knocked out the enemy pillboxes with flame-throwers
and demolition-charges.
|
|
|
|
18 |
|
|
Meanwhile, at 0510, the 362nd Combat Team moved against the enemy’s defenses on
the Arzew shore, cut the road leading to the city and struck 1000 yards inland
to its first objective. By 1000 the entire Regiment was ashore, and the town had
been captured. Reverting to the approach march formation with the 3rd Battalion
in the lead, the Regiment advanced on the Division objective and by 1400 had
joined forces with the 363rd on its
right flank in seizing the high ground south of Kleber. The operation, viewed
as a whole, was declared a success, and the training went a 1ong way toward
hardening the Division for the combat it was to meet in the Italian front.
Staging area near Oran
Italy
|
|
|
|
19 |
|
|
The move to Italy was initiated 15 June when the Division, with its greatest
"maneuver" lying ahead, left Staging Area No. 2 to embark on ships in the harbor
of Oran. The following day, 16
June, the 91st less its rear echelon headquarters steamed out of Oran destined
for Naples and the smaller port of Bagnoli, four miles north of the great base.
It arrived on the 19th of June and marched to Staging areas in the vicinity of
Bagnoli, where it began preparing for imminent entrance into combat. On 20 June
it was assigned to Fifth Army. First steps toward moving the Division into the
line were taken on 27 June, when General Livesay received a telegram from
General Mark W. Clark, commander of Fifth Army, ordering the Division to move on
approximately 30 June to the vicinity of Civitavecchia, north of Rome. At 0800 2
July the Division Command Post was opened at Montalto di Castro, four miles east
of Civitavecchia.
Baptism of Fire
In the meantime, the 361st Regimental Combat Team had entered combat attached to
the 36th Division. Having landed at Anzio on 1 June the Regiment took up
positions the following night on the ridge four miles northwest of Velletri. At
030530 June they jumped off, the first element of the 91st Division to enter
combat, and four hours later they received their first baptism of fire. The
next day the Regiment reverted to the control of VI Corps, but it was
immediately assigned to the 34th Division and began a series of rapid moves to
the north. On the night of 8-9 June the 361st Infantry relieved the 133rd
Infantry, 34th Division, and at 090530 June attacked north astride Highway 1.
Progress was rapid with the major delaying factors being mines, demolitions and
occasional enemy delaying positions. In succession the Regiment captured
Tarquinia,
Montalto di Castro, Nuxiatello, and Orbetello.
|
|
|
|
20 |
|
|
One of the stiffest engagements was met at Ponte d'Istia on the Ombrone River.
Here the Germans had a strong holding positron in the town and two hills nearby.
By infiltrating a whole Battalion over a partially destroyed dam single file,
one man at a time, and by taking advantage of all avenues of covered approach,
the Regiment completely surprised the enemy. Although they made a determined
effort to stop the attack with heavy artillery and mortar concentrations, the
3rd Battalion pushed ahead, and by 162030 June they had captured Hills 61 and
66, as well as the town of Ponte d’Istia itself. Many casualties were inflicted
on the enemy in the engagement, and approximately 8o prisoners were taken.
The rapid advance northward continued until 19 June, when the Regiment was
assembled near Batignano. Here, after a day's rest, they were attached to the
1st Armored Division. To all intents and purposes the Regimental Combat Team
for the time being lost its identity. The 2nd Battalion was attached to Task
Force Howze, while elements of the other Battalions were attached to any one of
three motorized Combat Teams as supporting infantry. The mission of the infantry
was to ride the tanks and the tank destroyer decks until opposition was
encountered: then the infantry was to deploy and attack. The main axis of
advance was the Batignano-Paganico-Roccostrada Highway.
|
|
|
|
21 |
|
|
During the following two weeks the men of the 361st Infantry saw much action.
The most bitter engagement of the period occurred at Casole d'Isola, where the
fighting lasted for four days, 1-4 July.
After the town had been captured, elements of the Regiment were relieved. On 6
July elements of the 2nd and 3rd Battalions returned to the control of the 361st
Infantry and the Regimental Combat Team returned to the control of the Division.
On 4 July the 363rd Regimental Combat Team commanded by Col. W. Fulton Magill,
Jr., was attached to the 34th Division to gain combat experience and entered
combat near Riparabella. Attacking through mountainous terrain, they captured
M. Vaso on 6 July and held it against very strong counterattacks. Although they
were forced by their losses to withdraw briefly; the hill was secured on 9 July,
and the advance continued toward the high ground west of Chianni. Opposition was
light but progress was slow, mainly as a result of the very difficult supply
situation.
Co. "C." 363 Inf. moves up to the jump off position for the first time
|
|
|
|
|
|